Projects & Installations

Go-Belt® Sampling Experience Across Mining Operations

T.K.O Engineering has supplied Go-Belt® sampling equipment and engineered sampling solutions to mining and mineral-processing operations over more than three decades.

The projects below present a selected view of Go-Belt® installations and T.K.O Engineering project experience.

35+ YEARS

Sampling Experience

SOUTH AFRICAN OEM

Go-Belt® Sampling Technology

MULTIPLE PROJECT TYPES

Samplers, Systems & Sampling Plants

OEM SUPPORT

Installation & Lifecycle Support

Selected Go-Belt® Projects & Installations

Harmony Gold — Doornkop

Location: South Africa

Commodity: Gold

Year: 2024

Scope: Go-Belt® Sampler installation

Sibanye-Stillwater — Driefontein Operations, Mill Plant 1 & 2

Location: South Africa

Commodity: Gold

Year: 2023

Scope: 2 × Go-Belt® Samplers

Harmony Gold — Target

Location: Free State, South Africa

Commodity: Gold

Year: 2024

Scope: Go-Belt® Sampler

Harmony Gold — Mponeng

Location: South Africa

Commodity: Gold

Year: 2022

Scope: Go-Belt® Sampler installation

Recent Go-Belt® Project Experience

YearClientProjectCountryCommodity
2026Sibanye-StillwaterBeatrix R4South AfricaGold
2025Sibanye-StillwaterEZ Uranium Met Plant — Cooke 4 PlantSouth AfricaGold
2025BarrickGo-Belt® Sampler ProjectTanzaniaGold
2024Harmony GoldTarget PlantSouth AfricaGold
2024Harmony GoldDoornkopSouth AfricaGold
2023Sibanye-StillwaterDriefontein Operations — Mill Plant 1 & 2South AfricaGold

Historical Go-Belt® Experience

Go-Belt® sampling technology has a project history extending over more than three decades. Selected historical sampling-plant references include:

YearOperationLocation
1992Vaal Reefs West PlantSouth Africa
2001Modikwa Concentrator PlantSouth Africa
2008Central Deep Plant CV-02Rustenburg, South Africa

Vaal Reefs West Plant now forms part of Harmony Doornkop operations.
Central Deep Plant CV-02 now forms part of Sibanye-Stillwater operations.

From Individual Samplers to Integrated Sampling Plants

T.K.O Engineering project scope can range from individual Go-Belt® Samplers through integrated Sampling Systems to complete engineered Sampling Plants, depending on the requirements of the application.

Samplers

Individual Go-Belt® sampling machines engineered for the applicable material-stream arrangement.

Sampling Systems

Go-Belt® Samplers integrated with the required sample-transfer, handling, collection, control and preparation equipment.

Sampling Plants

Broader engineered facilities incorporating multiple stages of sampling, sample handling, preparation, division and collection.

Installation Gallery

Manufacturing

Go-Belt® equipment during workshop manufacture and assembly.

Site Delivery

Go-Belt® equipment prepared for or delivered to site.

Installation

Go-Belt® equipment during site installation.

Sample Handling

Go-Belt® sample-discharge and collection arrangement.

Installed Equipment

Go-Belt® equipment installed within the operating environment.

Discuss Your Sampling Project

Speak with T.K.O Engineering about a Go-Belt® Sampler, integrated Sampling System or engineered Sampling Plant for your mining or mineral-processing application.

T.K.O Engineering CC

Trevor Roberts | Engineering Project Manager

Phone: +27 82 350 4619 | Email: trevor@tkoengineering.com

© 2026 T.K.O Engineering CC. All rights reserved.

GO-BELT® is a registered trademark of T.K.O Engineering CC.